Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Joint Compound
NAICS
n/a
SIC 2891: Adhesives and Sealants
Sales Range $10
M
to 50
M
# of Employees 67
Plant Area 70,000
ft2
Annual Production 261,000,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,057 2,859,613
kWh
Electricity Demand $95,062 5,966
kW-mo/yr
Electricity Fees $10,133 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $281,772 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,133

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
01 2.4133: Use most efficient type of electric motors $564 $4,997 $172
7,327
kWh
$365
-
kW-mo/yr
$27 - - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,920 $2,120 $552
24,033
kWh
$1,277
-
kW-mo/yr
$91 - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,899 $450 $2,112
91,442
kWh
$2,554
-
kW-mo/yr
$233 - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,314 $7,680 $2,364
102,286
kWh
$3,649
-
kW-mo/yr
$301 - - -
05 4.211: Consider use / purchase of bulk materials where possible $139,500 $155,000 - - - $700
-
lb
- $138,800
06 3.7212: Improved material handling (mixing and transfer) $3,175 $2,800 - - - - - $3,175
07 4.441: Install automatic packing equipment $125,400 $150,000 - - - - $125,400 -
TOTAL RECOMMENDED $281,772 $323,047 $5,200
225,088
kWh
$7,845
-
kW-mo/yr
$652 $700
-
lb
$125,400 $141,975
TOTAL IMPLEMENTED $13,133 $10,250 $5,028
217,761
kWh
$7,480
-
kW-mo/yr
$625 - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs