ITAC Assessment: GT0581
ITAC logo
ITAC Assessment: GT0581
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Envelopes, Business Forms
NAICS
n/a
SIC 2677: Envelopes
Sales Range $10
M
to 50
M
# of Employees 106
Plant Area 25,000
ft2
Annual Production 280,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $20,991 801,290
kWh
Electricity Demand $41,000 2,737
kW-mo/yr
Electricity Fees $5,897 -
Natural Gas $3,324 606
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,748 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $595

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 2.4133: Use most efficient type of electric motors $243 $1,809 $66
2,638
kWh
$165
-
kW-mo/yr
$12 - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $8,790 $17,040 $3,877
148,007
kWh
$4,494
-
kW-mo/yr
$419 - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $595 $100 $138
5,275
kWh
$429
-
kW-mo/yr
$28 - -
04 3.2172: Use automatic cleaning equipment $22,900 $24,000 - - - $18,225
-
lb
$4,675
05 3.1162: Use less wasteful packaging $220 $500 - - - $220
-
lb
-
TOTAL RECOMMENDED $32,748 $43,449 $4,081
155,920
kWh
$5,088
-
kW-mo/yr
$459 $18,445
-
lb
$4,675
TOTAL IMPLEMENTED $595 $100 $138
5,275
kWh
$429
-
kW-mo/yr
$28 - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs