ITAC Assessment: GT0544
ITAC logo
ITAC Assessment: GT0544
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Ashaplt
NAICS
n/a
SIC 2911: Petroleum Refining
Sales Range $50
M
to 100
M
# of Employees 42
Plant Area 10,000
ft2
Annual Production 4,800,000
bbl
Production Hrs. Annual 7,224
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $302,920 5,939,918
kWh
Natural Gas $1,807,067 614,501
MMBtu
LPG $280,135 113,112
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $119,525 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,220

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $4,820 $20,170 $4,820
94,666
kWh
-
02 2.2135: Repair and eliminate steam leaks $5,240 $800 - $5,240
-
MMBtu
03 2.2437: Recover waste heat from equipment $77,700 $212,000 - $77,700
-
MMBtu
04 2.2121: Increase amount of condensate returned $18,160 $13,550 - $18,160
-
MMBtu
05 2.2511: Insulate bare equipment $3,090 $2,665 - $3,090
-
MMBtu
06 2.2124: Install de-aerator in place of condensate tank $8,610 $13,750 - $8,610
-
MMBtu
07 2.1243: Use heat from boiler blowdown to preheat boiler feed water $1,905 $4,800 - $1,905
-
MMBtu
TOTAL RECOMMENDED $119,525 $267,735 $4,820
94,666
kWh
$114,705
-
MMBtu
TOTAL IMPLEMENTED $28,220 $34,520 $4,820
94,666
kWh
$23,400
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs