ITAC Assessment: GT0458
ITAC logo
ITAC Assessment: GT0458
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product VIDEO CASSETTE CASES
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 91
Plant Area
n/a
Annual Production 21,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $486,053 9,395,956
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,480 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $41,480

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $580 $1,740 $580
11,430
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,900 $10,600 $6,900
132,767
kWh
03 2.4312: Improve lubrication practices $1,000 - $1,000
19,637
kWh
04 2.2211: Use optimum temperature $7,600 - $7,600
147,714
kWh
05 2.7226: Use computer programs to optimize hvac performance $3,200 $700 $3,200
62,720
kWh
06 2.7226: Use computer programs to optimize hvac performance $3,200 $10,500 $3,200
62,720
kWh
07 2.2614: Use cooling tower or economizer to replace chiller cooling $19,000 $7,320 $19,000
368,113
kWh
TOTAL RECOMMENDED $41,480 $30,860 $41,480
805,101
kWh
TOTAL IMPLEMENTED $41,480 $30,860 $41,480
805,101
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs