| Assessment Year | 1989 |
|---|---|
| Principal Product | CUSTOM PLASTIC PRODUCTS |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $1 M to 5M |
| # of Employees | 35 |
| Plant Area |
n/a
|
| Annual Production | 500,000
lb
|
| Production Hrs. Annual | 2,000
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $103,907 | 1,228,019 |
kWh
|
$0.085 |
| Natural Gas | $2,495 | 443 |
MMBtu
|
$5.63 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $36,532 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $19,202 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|
| 01 | 2.8114: Change rate schedules or other changes in utility service | $17,330 | - |
$20,580
-
kWh
|
$(-3,250.0) | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $95 | $58 |
$95
1,172
kWh
|
- | |
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $83 | - |
$83
1,172
kWh
|
- | |
| 04 | 2.4133: Use most efficient type of electric motors | $69 | $80 |
$69
879
kWh
|
- | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $339 | - |
$339
4,689
kWh
|
- | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $680 | $20 |
$680
9,379
kWh
|
- | |
| 07 | 3.4154: Eliminate leaks in water lines and valves | $921 | $150 |
$751
10,258
kWh
|
$170 | |
| 08 | 2.4322: Use or replace with energy efficient substitutes | $17,015 | $39,300 |
$17,015
234,174
kWh
|
- | |
| TOTAL RECOMMENDED | $36,532 | $39,608 |
$39,612
261,723
kWh
|
$(-3,080.0) | ||
| TOTAL IMPLEMENTED | $19,202 | $39,608 |
$19,032
261,723
kWh
|
$170 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs