Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product CUSTOM PLASTIC PRODUCTS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 35
Plant Area
n/a
Annual Production 500,000
lb
Production Hrs. Annual 2,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $103,907 1,228,019
kWh
Natural Gas $2,495 443
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,532 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,202

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $17,330 - $20,580
-
kWh
$(-3,250.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $95 $58 $95
1,172
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $83 - $83
1,172
kWh
-
04 2.4133: Use most efficient type of electric motors $69 $80 $69
879
kWh
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $339 - $339
4,689
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $680 $20 $680
9,379
kWh
-
07 3.4154: Eliminate leaks in water lines and valves $921 $150 $751
10,258
kWh
$170
08 2.4322: Use or replace with energy efficient substitutes $17,015 $39,300 $17,015
234,174
kWh
-
TOTAL RECOMMENDED $36,532 $39,608 $39,612
261,723
kWh
$(-3,080.0)
TOTAL IMPLEMENTED $19,202 $39,608 $19,032
261,723
kWh
$170
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs