ITAC Assessment: GT0324
ITAC logo
ITAC Assessment: GT0324
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product PLASTIC PACKAGING FILM
NAICS
n/a
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $10
M
to 50
M
# of Employees 132
Plant Area
n/a
Annual Production 31,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $686,382 15,447,245
kWh
Natural Gas $61,716 11,608
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,958 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,900

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7121: Utilize daylight whenever possible in lieu of artificial light $170 - $170
3,810
kWh
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,980 - $1,980
44,842
kWh
03 2.2511: Insulate bare equipment $2,990 $1,400 $2,990
67,409
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $14,078 $17,060 $14,078
317,116
kWh
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,220 $1,780 $2,220
50,117
kWh
06 2.4133: Use most efficient type of electric motors $520 $1,883 $520
11,723
kWh
TOTAL RECOMMENDED $21,958 $22,123 $21,958
495,017
kWh
TOTAL IMPLEMENTED $5,900 $5,063 $5,900
133,059
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs