ITAC Assessment: GT0299
ITAC logo
ITAC Assessment: GT0299
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product PACKAGED CHICKEN
NAICS
n/a
SIC 2015: Poultry Slaughtering and Processing
Sales Range $10
M
to 50
M
# of Employees 500
Plant Area
n/a
Annual Production 32,000,000
pieces
Production Hrs. Annual 3,500
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $579,178 11,837,046
kWh
Natural Gas $237,825 50,238
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,516 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,454

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $818 $2,688 - $818
-
MMBtu
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,563 - $1,563
-
kWh
-
03 2.2449: Recover heat from exhausted steam, hot air or hot water $20,878 $34,000 - $20,878
-
MMBtu
04 2.4133: Use most efficient type of electric motors $574 $983 $574
11,723
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,032 $4,245 $1,032
21,102
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $488 $219 $488
9,965
kWh
-
07 2.8114: Change rate schedules or other changes in utility service $9,163 $3,000 $9,163
-
kWh
-
TOTAL RECOMMENDED $34,516 $45,135 $12,820
42,790
kWh
$21,696
-
MMBtu
TOTAL IMPLEMENTED $33,454 $43,933 $11,758
21,102
kWh
$21,696
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs