Assessment Year | 1986 |
---|---|
Principal Product | ELEC BLANKETS & HEAT PADS |
NAICS |
n/a
|
SIC | 2221: Broadwoven Fabric Mills, Manmade Fiber and Silk |
Sales Range | $10 M to 50M |
# of Employees | 490 |
Plant Area |
n/a
|
Annual Production | 1,480,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | South Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $233,667 | 5,126,905 |
kWh
|
$0.046 |
Natural Gas | $77,616 | 12,622 |
MMBtu
|
$6.15 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $72,291 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $290 | $1,543 |
$290
6,448
kWh
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $38,521 | $55,846 |
$38,521
856,389
kWh
|
- | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $200 | $400 |
$200
4,396
kWh
|
- | - | |
04 | 2.7221: Lower temperature during the winter season and vice-versa | $4,400 | - |
$4,400
97,890
kWh
|
- | - | |
05 | 2.7226: Use computer programs to optimize hvac performance | $8,470 | $11,000 |
$8,470
188,159
kWh
|
- | - | |
06 | 2.2136: Install / repair insulation on steam lines | $2,775 | $910 | - |
$2,775
-
MMBtu
|
- | |
07 | 2.6122: Adjust vents to minimize energy use | $4,435 | $1,000 | - |
$4,435
-
MMBtu
|
- | |
08 | 2.1333: Convert combustion equipment to burn oil | $6,760 | - | - |
$27,625
-
MMBtu
|
$(-20,865.0)
-
MMBtu
|
|
09 | 2.7221: Lower temperature during the winter season and vice-versa | $6,440 | - | - |
$6,440
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $72,291 | $70,699 |
$51,881
1,153,282
kWh
|
$41,275
-
MMBtu
|
$(-20,865.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs