Assessment Year | 1986 |
---|---|
Principal Product | CARPET |
NAICS |
n/a
|
SIC | 2273: Carpets and Rugs |
Sales Range | $10 M to 50M |
# of Employees | 495 |
Plant Area |
n/a
|
Annual Production | 81,000
thousand feet
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $799,702 | 14,713,072 |
kWh
|
$0.054 |
Natural Gas | $1,115 | 201 |
MMBtu
|
$5.55 |
Coal | $620,362 | 342,857 |
MMBtu
|
$1.81 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $103,579 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $70,363 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Coal Savings |
---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $1,733 | $2,969 |
$1,733
32,825
kWh
|
- | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $65,300 | $75,000 | - |
$65,300
-
MMBtu
|
|
03 | 2.5192: Modify textile dryers | $15,800 | $10,000 | - |
$15,800
-
MMBtu
|
|
04 | 2.5194: Redesign process | $11,566 | - |
$11,566
470,399
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,360 | $10,588 |
$3,360
63,599
kWh
|
- | |
06 | 2.2136: Install / repair insulation on steam lines | $3,330 | $3,045 | - |
$3,330
-
MMBtu
|
|
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,490 | - |
$2,490
46,893
kWh
|
- | |
TOTAL RECOMMENDED | $103,579 | $101,602 |
$19,149
613,716
kWh
|
$84,430
-
MMBtu
|
||
TOTAL IMPLEMENTED | $70,363 | $81,014 |
$1,733
32,825
kWh
|
$68,630
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Coal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs