ITAC Assessment: GT0293
ITAC logo
ITAC Assessment: GT0293
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product CARPET
NAICS
n/a
SIC 2273: Carpets and Rugs
Sales Range $10
M
to 50
M
# of Employees 495
Plant Area
n/a
Annual Production 81,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $799,702 14,713,072
kWh
Natural Gas $1,115 201
MMBtu
Coal $620,362 342,857
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $103,579 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $70,363

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Coal Savings
01 2.4133: Use most efficient type of electric motors $1,733 $2,969 $1,733
32,825
kWh
-
02 2.2414: Use waste heat from hot flue gases to preheat $65,300 $75,000 - $65,300
-
MMBtu
03 2.5192: Modify textile dryers $15,800 $10,000 - $15,800
-
MMBtu
04 2.5194: Redesign process $11,566 - $11,566
470,399
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,360 $10,588 $3,360
63,599
kWh
-
06 2.2136: Install / repair insulation on steam lines $3,330 $3,045 - $3,330
-
MMBtu
07 2.4231: Reduce the pressure of compressed air to the minimum required $2,490 - $2,490
46,893
kWh
-
TOTAL RECOMMENDED $103,579 $101,602 $19,149
613,716
kWh
$84,430
-
MMBtu
TOTAL IMPLEMENTED $70,363 $81,014 $1,733
32,825
kWh
$68,630
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Coal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs