ITAC Assessment: GT0253
ITAC logo
ITAC Assessment: GT0253
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product ALUMINUM EXTRUSIONS
NAICS
n/a
SIC 3354: Aluminum Extruded Products
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 8,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $225,504 3,446,952
kWh
Natural Gas $188,812 33,854
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,464 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,707

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2135: Repair and eliminate steam leaks $3,190 $900 - $3,190
-
MMBtu
02 2.2136: Install / repair insulation on steam lines $700 $1,100 - $700
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $3,860 $1,000 - $3,860
-
MMBtu
04 2.1232: Keep boiler tubes clean $3,230 $1,000 - $3,230
-
MMBtu
05 2.6212: Turn off equipment during breaks, reduce operating time $510 - $510
8,792
kWh
-
06 2.4133: Use most efficient type of electric motors $957 $563 $957
46,014
kWh
-
07 2.8114: Change rate schedules or other changes in utility service $10,017 $40,000 $10,017
-
kWh
-
TOTAL RECOMMENDED $22,464 $44,563 $11,484
54,806
kWh
$10,980
-
MMBtu
TOTAL IMPLEMENTED $8,707 $3,563 $957
46,014
kWh
$7,750
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs