ITAC Assessment: GT0209
ITAC logo
ITAC Assessment: GT0209
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product CARPETS
NAICS
n/a
SIC 2273: Carpets and Rugs
Sales Range $100
M
to 500
M
# of Employees 275
Plant Area
n/a
Annual Production 22,200,000
thousand feet
Production Hrs. Annual 4,500
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $168,648 3,521,981
kWh
Natural Gas $499,412 98,239
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $187,186 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,272

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $14,600 $500 - $14,600
-
MMBtu
02 2.5191: Modify dye beck $77,000 $100,000 $(-24,000.0)
(-498,242)
kWh
$101,000
-
MMBtu
03 2.5191: Modify dye beck $23,700 - - $23,700
-
MMBtu
04 2.5191: Modify dye beck $7,435 $60,000 - $7,435
-
MMBtu
05 2.5191: Modify dye beck $7,227 $15,000 - $7,227
-
MMBtu
06 2.5192: Modify textile dryers $24,720 $20,000 - $24,720
-
MMBtu
07 2.1243: Use heat from boiler blowdown to preheat boiler feed water $11,360 $10,000 - $11,360
-
MMBtu
08 2.7142: Utilize higher efficiency lamps and/or ballasts $3,672 $5,000 $3,672
76,788
kWh
-
09 2.3191: Use demand controller or load shedder $17,472 $40,000 $17,472
-
kWh
-
TOTAL RECOMMENDED $187,186 $250,500 $(-2,856.0)
(-421,454)
kWh
$190,042
-
MMBtu
TOTAL IMPLEMENTED $18,272 $5,500 $3,672
76,788
kWh
$14,600
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs