| Assessment Year | 1984 |
|---|---|
| Principal Product | CARPETS |
| NAICS |
n/a
|
| SIC | 2273: Carpets and Rugs |
| Sales Range | $100 M to 500M |
| # of Employees | 275 |
| Plant Area |
n/a
|
| Annual Production | 22,200,000
thousand feet
|
| Production Hrs. Annual | 4,500
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $168,648 | 3,521,981 |
kWh
|
$0.048 |
| Natural Gas | $499,412 | 98,239 |
MMBtu
|
$5.08 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $187,186 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $18,272 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $14,600 | $500 | - |
$14,600
-
MMBtu
|
|
| 02 | 2.5191: Modify dye beck | $77,000 | $100,000 |
$(-24,000.0)
(-498,242)
kWh
|
$101,000
-
MMBtu
|
|
| 03 | 2.5191: Modify dye beck | $23,700 | - | - |
$23,700
-
MMBtu
|
|
| 04 | 2.5191: Modify dye beck | $7,435 | $60,000 | - |
$7,435
-
MMBtu
|
|
| 05 | 2.5191: Modify dye beck | $7,227 | $15,000 | - |
$7,227
-
MMBtu
|
|
| 06 | 2.5192: Modify textile dryers | $24,720 | $20,000 | - |
$24,720
-
MMBtu
|
|
| 07 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $11,360 | $10,000 | - |
$11,360
-
MMBtu
|
|
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,672 | $5,000 |
$3,672
76,788
kWh
|
- | |
| 09 | 2.3191: Use demand controller or load shedder | $17,472 | $40,000 |
$17,472
-
kWh
|
- | |
| TOTAL RECOMMENDED | $187,186 | $250,500 |
$(-2,856.0)
(-421,454)
kWh
|
$190,042
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $18,272 | $5,500 |
$3,672
76,788
kWh
|
$14,600
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs