Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product POLYETHYLENE FILM
NAICS
n/a
SIC 3083: Laminated Plastics Plate, Sheet, and Profile Shapes
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 30,000,000
lb
Production Hrs. Annual 8,568
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $629,516 17,507,914
kWh
Natural Gas $19,866 3,428
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,382 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3521: Reduce load on electrical conductor to reduce heating losses $20,000 $28,000 $20,000
556,858
kWh
-
02 2.3191: Use demand controller or load shedder $10,422 $9,000 $10,422
-
kWh
-
03 2.4133: Use most efficient type of electric motors $12,800 $65,900 $12,800
357,562
kWh
-
04 2.3212: Optimize plant power factor $5,360 $12,000 $5,360
148,886
kWh
-
05 2.7243: Improve air circulation with destratification fans / other methods $4,800 $1,000 - $4,800
-
MMBtu
TOTAL RECOMMENDED $53,382 $115,900 $48,582
1,063,306
kWh
$4,800
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs