ITAC Assessment: DS0128
ITAC logo
ITAC Assessment: DS0128
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Industrial Floor Cleaning Machines
NAICS
n/a
SIC 3589: Service Industry Machinery, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 450
Plant Area 500,000
ft2
Annual Production 52,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $223,230 6,661,489
kWh
Electricity Demand $118,284 15,108
kW-mo/yr
Electricity Fees $3,490 -
Natural Gas $142,217 33,727
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $289,708 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,686

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $14,686 $60,411 $10,176
299,531
kWh
$4,510
-
kW-mo/yr
- -
02 2.2511: Insulate bare equipment $189 $1,008 - - $189
-
MMBtu
-
03 2.2314: Replace heat treating oven with more efficient unit $274,833 $125,000 - - $25,233
-
MMBtu
$249,600
TOTAL RECOMMENDED $289,708 $186,419 $10,176
299,531
kWh
$4,510
-
kW-mo/yr
$25,422
-
MMBtu
$249,600
TOTAL IMPLEMENTED $14,686 $60,411 $10,176
299,531
kWh
$4,510
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs