| Assessment Year | 1996 |
|---|---|
| Principal Product | Beer |
| NAICS |
n/a
|
| SIC | 2082: Malt Beverages |
| Sales Range | $50 M to 100M |
| # of Employees | 300 |
| Plant Area |
1,039,326
ft2
|
| Annual Production | 2,300,000
bbl
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Minnesota |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $833,955 | 27,666,472 |
kWh
|
$0.030 |
| Electricity Demand | $380,053 | 56,256 |
kW-mo/yr
|
$6.76 |
| Electricity Fees | $1,741 | - |
|
- |
| Natural Gas | $1,094,513 | 420,420 |
MMBtu
|
$2.60 |
| Fuel Oil #2 | $168,996 | 34,493 |
MMBtu
|
$4.90 |
| Coal | $275,708 | 152,648 |
MMBtu
|
$1.81 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $572,309 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $572,309 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Coal Savings | Primary Raw Material Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $37,329 | $50,149 |
$28,511
950,762
kWh
|
$8,818
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.4133: Use most efficient type of electric motors | $5,076 | $14,727 |
$2,946
98,183
kWh
|
$2,130
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.2135: Repair and eliminate steam leaks | $722 | $800 | - | - |
$556
-
MMBtu
|
$166
-
MMBtu
|
- | |
| 04 | 3.1191: Change procedures / equipment / operating conditions | $529,182 | $413,400 |
$(-5,940.0)
(-59,203)
kWh
|
$105
-
kW-mo/yr
|
- | - | $535,017 | |
| TOTAL RECOMMENDED | $572,309 | $479,076 |
$25,517
989,742
kWh
|
$11,053
-
kW-mo/yr
|
$556
-
MMBtu
|
$166
-
MMBtu
|
$535,017 | ||
| TOTAL IMPLEMENTED | $572,309 | $479,076 |
$25,517
989,742
kWh
|
$11,053
-
kW-mo/yr
|
$556
-
MMBtu
|
$166
-
MMBtu
|
$535,017 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs