ITAC Assessment: DS0062
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Beer
NAICS
n/a
SIC 2082: Malt Beverages
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 1,039,326
ft2
Annual Production 2,300,000
bbl
Production Hrs. Annual 8,760
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $833,955 27,666,472
kWh
Electricity Demand $380,053 56,256
kW-mo/yr
Electricity Fees $1,741 -
Natural Gas $1,094,513 420,420
MMBtu
Fuel Oil #2 $168,996 34,493
MMBtu
Coal $275,708 152,648
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $572,309 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $572,309

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Coal Savings Primary Raw Material Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $37,329 $50,149 $28,511
950,762
kWh
$8,818
-
kW-mo/yr
- - -
02 2.4133: Use most efficient type of electric motors $5,076 $14,727 $2,946
98,183
kWh
$2,130
-
kW-mo/yr
- - -
03 2.2135: Repair and eliminate steam leaks $722 $800 - - $556
-
MMBtu
$166
-
MMBtu
-
04 3.1191: Change procedures / equipment / operating conditions $529,182 $413,400 $(-5,940.0)
(-59,203)
kWh
$105
-
kW-mo/yr
- - $535,017
TOTAL RECOMMENDED $572,309 $479,076 $25,517
989,742
kWh
$11,053
-
kW-mo/yr
$556
-
MMBtu
$166
-
MMBtu
$535,017
TOTAL IMPLEMENTED $572,309 $479,076 $25,517
989,742
kWh
$11,053
-
kW-mo/yr
$556
-
MMBtu
$166
-
MMBtu
$535,017
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs