Assessment Year | 1996 |
---|---|
Principal Product | Yeast |
NAICS |
n/a
|
SIC | 2099: Food Preparations, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 40 |
Plant Area |
36,200
ft2
|
Annual Production | 6,000,000
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $387,413 | 10,817,995 |
kWh
|
$0.036 |
Electricity Demand | $79,294 | 21,732 |
kW-mo/yr
|
$3.65 |
Electricity Fees | $1,088 | - |
|
- |
Natural Gas | $310,363 | 80,454 |
MMBtu
|
$3.86 |
LPG | $4,551 | 875 |
MMBtu
|
$5.20 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $49,412 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,559 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $841 | $1,173 |
$731
20,516
kWh
|
$110
-
kW-mo/yr
|
- | |
02 | 2.4133: Use most efficient type of electric motors | $5,017 | $11,575 |
$4,115
114,889
kWh
|
$902
-
kW-mo/yr
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $701 | $225 |
$701
19,637
kWh
|
- | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $14,650 | $4,100 |
$13,148
367,233
kWh
|
$1,502
-
kW-mo/yr
|
- | |
05 | 2.8113: Purchase gas directly from a contract gas supplier | $28,203 | $2,500 | - | - | $28,203 | |
TOTAL RECOMMENDED | $49,412 | $19,573 |
$18,695
522,275
kWh
|
$2,514
-
kW-mo/yr
|
$28,203 | ||
TOTAL IMPLEMENTED | $6,559 | $12,973 |
$5,547
155,042
kWh
|
$1,012
-
kW-mo/yr
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs