ITAC Assessment: DS0057
ITAC logo
ITAC Assessment: DS0057
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Yeast
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 36,200
ft2
Annual Production 6,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $387,413 10,817,995
kWh
Electricity Demand $79,294 21,732
kW-mo/yr
Electricity Fees $1,088 -
Natural Gas $310,363 80,454
MMBtu
LPG $4,551 875
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,412 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,559

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $841 $1,173 $731
20,516
kWh
$110
-
kW-mo/yr
-
02 2.4133: Use most efficient type of electric motors $5,017 $11,575 $4,115
114,889
kWh
$902
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $701 $225 $701
19,637
kWh
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,650 $4,100 $13,148
367,233
kWh
$1,502
-
kW-mo/yr
-
05 2.8113: Purchase gas directly from a contract gas supplier $28,203 $2,500 - - $28,203
TOTAL RECOMMENDED $49,412 $19,573 $18,695
522,275
kWh
$2,514
-
kW-mo/yr
$28,203
TOTAL IMPLEMENTED $6,559 $12,973 $5,547
155,042
kWh
$1,012
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs