ITAC Assessment: DS0006
ITAC logo
ITAC Assessment: DS0006
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Injection Molded Plastics
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 146
Plant Area 48,790
ft2
Annual Production 12,060,864
pieces
Production Hrs. Annual 6,120
hrs
Location (State) South Dakota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $128,323 3,169,988
kWh
Natural Gas $14,812 3,326
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,520 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,243

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,239 $12,100 $6,239
154,162
kWh
-
02 2.7135: Install occupancy sensors $1,571 $5,863 $1,571
45,135
kWh
-
03 2.4133: Use most efficient type of electric motors $4,004 $9,745 $4,004
98,769
kWh
-
04 2.7231: Use radiant heater for spot heating $3,587 $7,200 - $3,587
-
MMBtu
05 2.2511: Insulate bare equipment $13,284 $230 $13,284
328,839
kWh
-
06 2.3191: Use demand controller or load shedder $3,835 - $3,835
-
kWh
-
TOTAL RECOMMENDED $32,520 $35,138 $28,933
626,905
kWh
$3,587
-
MMBtu
TOTAL IMPLEMENTED $10,243 $21,845 $10,243
252,931
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs