Assessment Year | 1994 |
---|---|
Principal Product | Butter |
NAICS |
n/a
|
SIC | 2021: Creamery Butter |
Sales Range | $50 M to 100M |
# of Employees | 125 |
Plant Area |
65,600
ft2
|
Annual Production | 95,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $242,108 | 4,686,987 |
kWh
|
$0.052 |
Natural Gas | $4,665 | 928 |
MMBtu
|
$5.03 |
Other Energy | $252,012 | 38,911 |
MMBtu
|
$6.48 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $73,129 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,517 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Other Energy Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,039 | $14,247 |
$9,039
174,678
kWh
|
- | |
02 | 2.7135: Install occupancy sensors | $227 | $900 |
$227
4,396
kWh
|
- | |
03 | 2.4133: Use most efficient type of electric motors | $5,273 | $4,694 |
$5,273
101,993
kWh
|
- | |
04 | 2.2136: Install / repair insulation on steam lines | $3,195 | $285 | - |
$3,195
-
MMBtu
|
|
05 | 2.2135: Repair and eliminate steam leaks | $596 | $400 | - |
$596
-
MMBtu
|
|
06 | 2.4234: Cool compressor air intake with heat exchanger | $12,354 | $4,170 | - |
$12,354
-
MMBtu
|
|
07 | 2.4133: Use most efficient type of electric motors | $7,139 | $17,245 |
$7,139
138,042
kWh
|
- | |
08 | 2.2691: Shut off cooling if cold outside air will cool process | $7,726 | $26,660 |
$7,726
149,472
kWh
|
- | |
09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,257 | $1,504 |
$3,257
63,013
kWh
|
- | |
10 | 2.2511: Insulate bare equipment | $1,612 | $1,248 |
$1,612
38,101
kWh
|
- | |
11 | 2.2511: Insulate bare equipment | $201 | $153 |
$201
5,569
kWh
|
- | |
12 | 2.2511: Insulate bare equipment | $150 | $138 |
$150
7,034
kWh
|
- | |
13 | 2.2121: Increase amount of condensate returned | $22,360 | $4,000 | - |
$22,360
-
MMBtu
|
|
TOTAL RECOMMENDED | $73,129 | $75,644 |
$34,624
682,298
kWh
|
$38,505
-
MMBtu
|
||
TOTAL IMPLEMENTED | $11,517 | $27,345 |
$7,726
149,472
kWh
|
$3,791
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Other Energy Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs