ITAC Assessment: DL0164
ITAC logo
ITAC Assessment: DL0164
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Bleach
NAICS 325612: Polish and Other Sanitation Good Manufacturing
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 49
Plant Area 10,000
ft2
Annual Production 15,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $314,425 69,966,343
kWh
Electricity Demand $495,083 131,167
kW-mo/yr
Natural Gas $109,877 13,410
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $471,194 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,513

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6242: Minimize operation of equipment maintained in standby condition $109,877 $5,990 - - $109,877
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $18,095 $32,300 $16,415
328,300
kWh
$1,680
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,513 $59,950 $14,976
299,720
kWh
$1,537
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,804 $11,335 $3,450
69,007
kWh
$354
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,606 $16,930 $2,991
59,836
kWh
$615
-
kW-mo/yr
-
06 2.1336: Install equipment to utilize waste fuel $319,299 $522,826 $319,299
7,171,819
kWh
- -
TOTAL RECOMMENDED $471,194 $649,331 $357,131
7,928,682
kWh
$4,186
-
kW-mo/yr
$109,877
-
MMBtu
TOTAL IMPLEMENTED $16,513 $59,950 $14,976
299,720
kWh
$1,537
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs