ITAC Assessment: DL0126
ITAC logo
ITAC Assessment: DL0126
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Vinyl Ester and Polyester
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area 29,916
ft2
Annual Production 0
units
Production Hrs. Annual 8,760
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $290,138 3,707,663
kWh
Natural Gas $388,297 76,492
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $376,540 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $286,800

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Primary Raw Material Savings
01 4.212: Adopt in-house material generation $283,400 $116,500 - - $283,400
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $19,000 $9,600 $19,000
249,000
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,400 $9,600 $17,400
222,165
kWh
- -
04 2.1133: Adjust burners for efficient operation $15,000 $50,000 - $15,000
-
MMBtu
-
05 2.1321: Replace fossil fuel equipment with electrical equipment $11,910 $8,200 $(-1,790.0)
(-22,900)
kWh
$13,700
-
MMBtu
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,180 $4,800 $10,180
130,000
kWh
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,050 $2,400 $5,050
64,500
kWh
- -
08 2.1392: Replace purchased steam with other energy source $7,300 $16,000 - $7,300
-
MMBtu
-
09 2.1392: Replace purchased steam with other energy source $3,900 $6,300 - $3,900
-
MMBtu
-
10 2.7142: Utilize higher efficiency lamps and/or ballasts $3,400 $7,400 $3,400
43,500
kWh
- -
TOTAL RECOMMENDED $376,540 $230,800 $53,240
686,265
kWh
$39,900
-
MMBtu
$283,400
TOTAL IMPLEMENTED $286,800 $123,900 $3,400
43,500
kWh
- $283,400
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs