ITAC Assessment: DL0029
ITAC logo
ITAC Assessment: DL0029
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product roasted coffee
NAICS 311920: Coffee and Tea Manufacturing
SIC 2095: Roasted Coffee
Sales Range $100
M
to 500
M
# of Employees 40
Plant Area 250,000
ft2
Annual Production 45,000
units
Production Hrs. Annual 2,080
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $560,000 4,300,000
kWh
Natural Gas $500,000 56,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $95,743 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $52,119

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $5,200 $500 $5,200
47,000
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,326 $4,000 $7,326
66,600
kWh
-
03 2.1113: Reduce combustion air flow to optimum $44,793 $11,000 - $44,793
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $36,724 $75,600 $36,724
333,855
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,700 $3,250 $1,700
15,400
kWh
-
TOTAL RECOMMENDED $95,743 $94,350 $50,950
462,855
kWh
$44,793
-
MMBtu
TOTAL IMPLEMENTED $52,119 $15,000 $7,326
66,600
kWh
$44,793
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs