ITAC Assessment: CO0689
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Precision cuts sheet metal
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area 72,700
ft2
Annual Production 666,000
pieces
Production Hrs. Annual 4,176
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,797 1,423,318
kWh
Electricity Demand $74,314 3,876
kW-mo/yr
Electricity Fees $4,816 -
Natural Gas $14,415 1,967
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,000 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,480 $4,200 $3,770
84,000
kWh
$2,710
-
kW-mo/yr
- - -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,310 $23,560 $3,500
78,100
kWh
$810
-
kW-mo/yr
- - -
03 2.8121: Apply for tax-free status for energy purchases $5,260 $1,500 - - - $5,260 -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,950 $18,390 $2,030
45,200
kWh
$2,740
-
kW-mo/yr
$110 - $70
TOTAL RECOMMENDED $21,000 $47,650 $9,300
207,300
kWh
$6,260
-
kW-mo/yr
$110 $5,260 $70
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs