| Assessment Year | 2000 |
|---|---|
| Principal Product | printed and unprinted envelopes |
| NAICS |
n/a
|
| SIC | 2677: Envelopes |
| Sales Range | $1 M to 5M |
| # of Employees | 150 |
| Plant Area |
22,960
ft2
|
| Annual Production | 186,000,000
pieces
|
| Production Hrs. Annual | 4,472
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $8,765 | 546,307 |
kWh
|
$0.016 |
| Electricity Demand | $21,055 | 1,622 |
kW-mo/yr
|
$12.98 |
| Electricity Fees | $193 | - |
|
- |
| Natural Gas | $950 | 130 |
MMBtu
|
$7.31 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $10,440 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4323: Use optimum size and capacity equipment | $5,760 | $15,500 |
$1,950
125,733
kWh
|
$3,810
-
kW-mo/yr
|
- | - | |
| 02 | 2.3191: Use demand controller or load shedder | $1,530 | $2,000 | - |
$1,530
-
kW-mo/yr
|
- | - | |
| 03 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $1,410 | $970 |
$1,410
90,563
kWh
|
- | - | - | |
| 04 | 2.2211: Use optimum temperature | $1,050 | $200 |
$330
21,102
kWh
|
$720
-
kW-mo/yr
|
- | - | |
| 05 | 2.7111: Reduce illumination to minimum necessary levels | $450 | $1,060 |
$120
7,913
kWh
|
$310
-
kW-mo/yr
|
- | $20 | |
| 06 | 2.7224: Reduce space conditioning during non-working hours | $220 | $150 |
$40
2,638
kWh
|
- |
$180
-
MMBtu
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $20 | - |
$40
2,345
kWh
|
$100
-
kW-mo/yr
|
- | $(-120.0) | |
| TOTAL RECOMMENDED | $10,440 | $19,880 |
$3,890
250,294
kWh
|
$6,470
-
kW-mo/yr
|
$180
-
MMBtu
|
$(-100.0) | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs