ITAC Assessment: CO0457
ITAC logo
ITAC Assessment: CO0457
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product hydraulic fluid control valves
NAICS
n/a
SIC 3492: Fluid Power Valves and Hose Fittings
Sales Range $1
M
to 5
M
# of Employees 140
Plant Area 62,500
ft2
Annual Production 10,000
pieces
Production Hrs. Annual 4,108
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $61,067 2,084,701
kWh
Electricity Demand $65,793 5,590
kW-mo/yr
Electricity Fees $3,137 -
Natural Gas $27,773 4,343
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,340 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,120

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $6,380 $7,500 - $6,380
-
kW-mo/yr
- - - -
02 2.7135: Install occupancy sensors $1,340 $2,850 $570
24,033
kWh
$770
-
kW-mo/yr
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $660 - $380
17,878
kWh
$1,120
-
kW-mo/yr
- - $(-240.0) $(-600.0)
04 2.7124: Make a practice of turning off lights when not needed $660 $1,000 $570
33,411
kWh
- - - - $90
05 3.3122: Use filtration, centrifuging to remove contaminants $1,880 - - - $50
-
gal
- $360 $1,470
06 3.6192: Use a less expensive method of waste removal $320 - - - - $360
-
lb
- $(-40.0)
07 4.621: Use fixtures to reduce machine changeout times $5,100 $1,510 - - - - $5,100 -
TOTAL RECOMMENDED $16,340 $12,860 $1,520
75,322
kWh
$8,270
-
kW-mo/yr
$50
-
gal
$360
-
lb
$5,220 $920
TOTAL IMPLEMENTED $13,120 $10,010 $950
51,289
kWh
$7,500
-
kW-mo/yr
- $360
-
lb
$4,860 $(-550.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs