Assessment Year | 1996 |
---|---|
Principal Product | fabric tops for sport utility vehicles |
NAICS |
n/a
|
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
61,820
ft2
|
Annual Production | 200,000
pieces
|
Production Hrs. Annual | 2,184
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $19,430 | 1,305,393 |
kWh
|
$0.015 |
Electricity Demand | $37,613 | 3,545 |
kW-mo/yr
|
$10.61 |
Natural Gas | $91,519 | 22,280 |
MMBtu
|
$4.11 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $8,973 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,973 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (haz) Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 3.1221: Use reactive rinsing | $2,770 | $600 | - | - | - |
$1,380
-
Tgal
|
- |
$1,390
-
Tgal
|
|
02 | 2.7313: Recycle air for heating, ventilation and air conditioning | $2,460 | $640 |
$(-10.0)
(-586)
kWh
|
$(-10.0)
-
kW-mo/yr
|
$2,480
-
MMBtu
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,177 | $568 |
$328
21,981
kWh
|
$849
-
kW-mo/yr
|
- | - | - | - | |
04 | 3.1175: Use a different or recycled raw material | $1,520 | $7,000 | - | - | - | - |
$1,520
-
lb
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $540 | $100 |
$180
12,309
kWh
|
$360
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.1122: Re-size charging openings or add a movable door on equipment | $460 | $280 | - | - |
$460
-
MMBtu
|
- | - | - | |
07 | 2.4133: Use most efficient type of electric motors | $46 | $115 |
$15
879
kWh
|
$31
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $8,973 | $9,303 |
$513
34,583
kWh
|
$1,230
-
kW-mo/yr
|
$2,940
-
MMBtu
|
$1,380
-
Tgal
|
$1,520
-
lb
|
$1,390
-
Tgal
|
||
TOTAL IMPLEMENTED | $8,973 | $9,303 |
$513
34,583
kWh
|
$1,230
-
kW-mo/yr
|
$2,940
-
MMBtu
|
$1,380
-
Tgal
|
$1,520
-
lb
|
$1,390
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (haz) Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs