ITAC Assessment: CO0368
ITAC logo
ITAC Assessment: CO0368
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product fabric tops for sport utility vehicles
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 61,820
ft2
Annual Production 200,000
pieces
Production Hrs. Annual 2,184
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $19,430 1,305,393
kWh
Electricity Demand $37,613 3,545
kW-mo/yr
Natural Gas $91,519 22,280
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,973 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,973

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (haz) Savings Water Consumption Savings
01 3.1221: Use reactive rinsing $2,770 $600 - - - $1,380
-
Tgal
- $1,390
-
Tgal
02 2.7313: Recycle air for heating, ventilation and air conditioning $2,460 $640 $(-10.0)
(-586)
kWh
$(-10.0)
-
kW-mo/yr
$2,480
-
MMBtu
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,177 $568 $328
21,981
kWh
$849
-
kW-mo/yr
- - - -
04 3.1175: Use a different or recycled raw material $1,520 $7,000 - - - - $1,520
-
lb
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $540 $100 $180
12,309
kWh
$360
-
kW-mo/yr
- - - -
06 2.1122: Re-size charging openings or add a movable door on equipment $460 $280 - - $460
-
MMBtu
- - -
07 2.4133: Use most efficient type of electric motors $46 $115 $15
879
kWh
$31
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $8,973 $9,303 $513
34,583
kWh
$1,230
-
kW-mo/yr
$2,940
-
MMBtu
$1,380
-
Tgal
$1,520
-
lb
$1,390
-
Tgal
TOTAL IMPLEMENTED $8,973 $9,303 $513
34,583
kWh
$1,230
-
kW-mo/yr
$2,940
-
MMBtu
$1,380
-
Tgal
$1,520
-
lb
$1,390
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (haz) Savings Water Consumption Savings