ITAC Assessment: CM1052
ITAC logo
ITAC Assessment: CM1052
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Panelized building components, wall panels, roof trusses, floor systems, framing assemblies
NAICS 321992: Prefabricated Wood Building Manufacturing
SIC 2452: Prefabricated Wood Buildings and Components
Sales Range $50
M
to 100
M
# of Employees 50
Plant Area 205,377
ft2
Annual Production 445
units
Production Hrs. Annual 2,860
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $12,313 321,840
kWh
Electricity Demand $32,701 1,279
kW-mo/yr
Electricity Fees $4,305 -
Natural Gas $30,041 3,784
MMBtu
LPG $16,597 585
MMBtu
Waste Disposal Costs
Water Usage $5,784 40,191
Tgal
TOTAL YEARLY COSTS $101,741
RECOMMENDED SAVINGS* $59,395 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Personnel Changes Savings
01 2.8226: Increase efficiency of trucks $23,789 $406,000 $(-2,887.0)
75,457
kWh
- - $16,596
-
MMBtu
$10,080
02 2.9114: Use solar heat to make electricty $18,183 $197,734 $8,800
230,005
kWh
$9,383
-
kW-mo/yr
- - -
03 2.7491: Insulate glazing, walls, ceilings, and roofs $7,467 $14,297 - - $7,467
-
MMBtu
- -
04 2.7232: Replace existing hvac unit with high efficiency model $4,486 $42,000 $1,027
26,838
kWh
$3,094
-
kW-mo/yr
$365
-
MMBtu
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,237 $1,015 $700
18,273
kWh
$2,537
-
kW-mo/yr
- - -
06 2.7491: Insulate glazing, walls, ceilings, and roofs $2,027 $37,800 - - $2,027
-
MMBtu
- -
07 2.7135: Install occupancy sensors $206 $594 $53
1,390
kWh
$153
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $59,395 $699,440 $7,693
351,963
kWh
$15,167
-
kW-mo/yr
$9,859
-
MMBtu
$16,596
-
MMBtu
$10,080
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs