Assessment Year | 2018 |
---|---|
Principal Product | High Speed Drill Bits |
NAICS | 333515: Cutting Tool and Machine Tool Accessory Manufacturing |
SIC | 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices |
Sales Range | $100 M to 500M |
# of Employees | 309 |
Plant Area |
200,000
ft2
|
Annual Production | 2,740,086
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | South Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $873,520 | 14,436,000 |
kWh
|
$0.061 | |
Electricity Demand | $66,387 | 5,060 |
kW-mo/yr
|
$13.12 | |
Natural Gas | $39,299 | 5,183 |
MMBtu
|
$7.58 | |
Waste Disposal Costs | |||||
Water Usage | $37,172 | 3,563,300 |
Tgal
|
$0.010 | |
TOTAL YEARLY COSTS | $1,016,378 | ||||
RECOMMENDED SAVINGS* | $108,694 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7224: Reduce space conditioning during non-working hours | $51,068 | $500 |
$51,068
865,560
kWh
|
- | - | - | |
02 | 2.7135: Install occupancy sensors | $38,713 | $42,563 |
$29,756
504,332
kWh
|
$8,957
-
kW-mo/yr
|
- | - | |
03 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $13,718 | $15,500 |
$10,512
178,178
kWh
|
$3,206
-
kW-mo/yr
|
- | - | |
04 | 3.4156: Use flow control valves on equipment to optimize water use | $3,717 | $3,050 | - | - | - |
$3,717
-
Tgal
|
|
05 | 2.1224: Replace boiler | $1,478 | $750 | - | - |
$1,478
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $108,694 | $62,363 |
$91,336
1,548,070
kWh
|
$12,163
-
kW-mo/yr
|
$1,478
-
MMBtu
|
$3,717
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs