ITAC Assessment: CL1807
ITAC logo
ITAC Assessment: CL1807
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product High Speed Drill Bits
NAICS 333515: Cutting Tool and Machine Tool Accessory Manufacturing
SIC 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices
Sales Range $100
M
to 500
M
# of Employees 309
Plant Area 200,000
ft2
Annual Production 2,740,086
lb
Production Hrs. Annual 8,760
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $873,520 14,436,000
kWh
Electricity Demand $66,387 5,060
kW-mo/yr
Natural Gas $39,299 5,183
MMBtu
Waste Disposal Costs
Water Usage $37,172 3,563,300
Tgal
TOTAL YEARLY COSTS $1,016,378
RECOMMENDED SAVINGS* $108,694 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings
01 2.7224: Reduce space conditioning during non-working hours $51,068 $500 $51,068
865,560
kWh
- - -
02 2.7135: Install occupancy sensors $38,713 $42,563 $29,756
504,332
kWh
$8,957
-
kW-mo/yr
- -
03 2.2614: Use cooling tower or economizer to replace chiller cooling $13,718 $15,500 $10,512
178,178
kWh
$3,206
-
kW-mo/yr
- -
04 3.4156: Use flow control valves on equipment to optimize water use $3,717 $3,050 - - - $3,717
-
Tgal
05 2.1224: Replace boiler $1,478 $750 - - $1,478
-
MMBtu
-
TOTAL RECOMMENDED $108,694 $62,363 $91,336
1,548,070
kWh
$12,163
-
kW-mo/yr
$1,478
-
MMBtu
$3,717
-
Tgal
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs