ITAC Assessment: CI0069
ITAC logo
ITAC Assessment: CI0069
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Theater
NAICS 512131: Motion Picture Theaters (except Drive-Ins)
SIC 7832: Motion Picture Theaters, Except Drive-In
Sales Range $5
M
to 10
M
# of Employees 97
Plant Area 25,897
ft2
Annual Production 50
units
Production Hrs. Annual 5,460
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $107,608 578,960
kWh
Electricity Demand $33,969 2,073
kW-mo/yr
Electricity Fees $18,249 -
Natural Gas $541 18
MMBtu
Other Gas $274 1
MMBtu
Waste Disposal Costs
Water Usage $10,776 708
Tgal
Water Disposal $6,877 708
Tgal
Other Liquid (non-haz) $1,611 1
gal
TOTAL YEARLY COSTS $179,905
RECOMMENDED SAVINGS* $57,546 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7262: Separate controls of air handlers from ac/ heating systems $14,994 $400 $14,994
80,655
kWh
-
02 2.7262: Separate controls of air handlers from ac/ heating systems $14,187 $10,300 $11,886
63,936
kWh
$2,301
-
kW-mo/yr
03 2.7232: Replace existing hvac unit with high efficiency model $13,109 $30,500 $13,109
70,501
kWh
-
04 2.7131: Add area lighting switches $6,398 $60,000 $6,398
34,414
kWh
-
05 2.7135: Install occupancy sensors $3,324 $3,600 $3,048
16,400
kWh
$276
-
kW-mo/yr
06 2.7134: Use photocell controls $1,883 $1,749 $941
5,060
kWh
$942
-
kW-mo/yr
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,849 $4,000 $1,849
9,947
kWh
-
08 2.4133: Use most efficient type of electric motors $1,802 $820 $1,586
8,530
kWh
$216
-
kW-mo/yr
TOTAL RECOMMENDED $57,546 $111,369 $53,811
289,443
kWh
$3,735
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs