ITAC Assessment: CI0051
ITAC logo
ITAC Assessment: CI0051
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Educational Building
NAICS 611310: Colleges, Universities, and Professional Schools
SIC 8221: Colleges, Universities, and Professional Schools
Sales Range $1
M
to 5
M
# of Employees 8
Plant Area 6,500
ft2
Annual Production 100,000
units
Production Hrs. Annual 2,450
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $22,300 55,749
kWh
Natural Gas $36,056 26,439
MMBtu
TOTAL YEARLY COSTS $58,356
RECOMMENDED SAVINGS* $31,170 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $21,123 $70,989 $21,123
52,808
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,245 $1,463 $3,245
8,112
kWh
-
03 2.7135: Install occupancy sensors $2,225 $1,050 $2,225
5,562
kWh
-
04 2.7493: Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses $1,951 $15,625 $1,951
4,878
kWh
-
05 2.1321: Replace fossil fuel equipment with electrical equipment $1,418 $8,000 - $1,418
-
MMBtu
06 2.6218: Turn off equipment when not in use $1,208 $580 $1,208
3,019
kWh
-
TOTAL RECOMMENDED $31,170 $97,707 $29,752
74,379
kWh
$1,418
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs