ITAC Assessment: BD0402
ITAC logo
ITAC Assessment: BD0402
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Farm machinery
NAICS 333111: Farm Machinery and Equipment Manufacturing
SIC 3523: Farm Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 72
Plant Area 120,000
ft2
Annual Production 250
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $42,901 468,780
kWh
Electricity Fees $931 -
LPG $54,340 3,090
MMBtu
Fuel Oil #2 $1,618 63
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,153 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $923

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Fuel Oil #2 Savings
01 2.8227: Adjust / maintain fork lift trucks for most efficient operation $19,742 $54,000 $(-13,322.0)
(-145,600)
kWh
$31,446
-
MMBtu
$1,618
-
MMBtu
02 2.7231: Use radiant heater for spot heating $7,374 $17,400 - $7,374
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,576 $11,333 $4,576
50,047
kWh
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,552 $20 $1,552
16,604
kWh
- -
05 2.7135: Install occupancy sensors $1,520 $1,275 $1,520
16,609
kWh
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $923 $100 $923
10,093
kWh
- -
07 2.4133: Use most efficient type of electric motors $757 $1,700 $757
8,277
kWh
- -
08 2.7134: Use photocell controls $709 $800 $709
7,584
kWh
- -
TOTAL RECOMMENDED $37,153 $86,628 $(-3,285.0)
(-36,386)
kWh
$38,820
-
MMBtu
$1,618
-
MMBtu
TOTAL IMPLEMENTED $923 $100 $923
10,093
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs