ITAC Assessment: BD0037
ITAC logo
ITAC Assessment: BD0037
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Stainless Steel Wire
NAICS
n/a
SIC 3315: Steel Wiredrawing and Steel Nails and Spikes
Sales Range $1
M
to 5
M
# of Employees 9
Plant Area 22,400
ft2
Annual Production 2,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,216 627,784
kWh
Natural Gas $10,342 2,702
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,395 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,923

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $602 $174 - $602
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $706 $359 $706
9,379
kWh
-
03 2.4133: Use most efficient type of electric motors $2,988 $3,590 $2,988
39,859
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,911 $5,060 $2,911
38,687
kWh
-
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $20,870 $17,500 $28,005
436,694
kWh
$(-7,135.0)
-
MMBtu
06 2.7135: Install occupancy sensors $318 $150 $318
4,103
kWh
-
TOTAL RECOMMENDED $28,395 $26,833 $34,928
528,722
kWh
$(-6,533.0)
-
MMBtu
TOTAL IMPLEMENTED $6,923 $9,159 $6,923
92,028
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs