ITAC Assessment: AS0507
ITAC logo
ITAC Assessment: AS0507
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Treated Wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 23
Plant Area 3,260,000
ft2
Annual Production 6,205,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,057,653 18,700,148
kWh
Electricity Demand $295,996 33,086
kW-mo/yr
Electricity Fees $226,966 -
TOTAL YEARLY COSTS $1,580,615
RECOMMENDED SAVINGS* $329,209 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,576

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $264,515 $3,928 $228,338
4,005,928
kWh
$36,177
-
kW-mo/yr
- -
02 2.8114: Change rate schedules or other changes in utility service $38,000 $200 - $29,203
-
kW-mo/yr
$8,797 -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $15,118 $2,000 $9,612
-
kWh
$5,506
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,284 $15,621 $5,496
96,467
kWh
$1,042
-
kW-mo/yr
- $(-1,254.0)
05 2.7135: Install occupancy sensors $4,787 $2,803 $4,787
83,862
kWh
- - -
06 2.7272: Install heat pipes / raise cooling setpoint $1,505 $943 $1,351
23,699
kWh
$154
-
kW-mo/yr
- -
TOTAL RECOMMENDED $329,209 $25,495 $249,584
4,209,956
kWh
$72,082
-
kW-mo/yr
$8,797 $(-1,254.0)
TOTAL IMPLEMENTED $11,576 $19,367 $11,634
204,028
kWh
$1,196
-
kW-mo/yr
- $(-1,254.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs