Assessment Year | 2021 |
---|---|
Principal Product | Treated Wastewater |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | less than $500 k |
# of Employees | 23 |
Plant Area |
3,260,000
ft2
|
Annual Production | 6,205,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,057,653 | 18,700,148 |
kWh
|
$0.057 |
Electricity Demand | $295,996 | 33,086 |
kW-mo/yr
|
$8.95 |
Electricity Fees | $226,966 | - |
|
- |
TOTAL YEARLY COSTS | $1,580,615 | |||
RECOMMENDED SAVINGS* | $329,209 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,576 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $264,515 | $3,928 |
$228,338
4,005,928
kWh
|
$36,177
-
kW-mo/yr
|
- | - | |
02 | 2.8114: Change rate schedules or other changes in utility service | $38,000 | $200 | - |
$29,203
-
kW-mo/yr
|
$8,797 | - | |
03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $15,118 | $2,000 |
$9,612
-
kWh
|
$5,506
-
kW-mo/yr
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,284 | $15,621 |
$5,496
96,467
kWh
|
$1,042
-
kW-mo/yr
|
- | $(-1,254.0) | |
05 | 2.7135: Install occupancy sensors | $4,787 | $2,803 |
$4,787
83,862
kWh
|
- | - | - | |
06 | 2.7272: Install heat pipes / raise cooling setpoint | $1,505 | $943 |
$1,351
23,699
kWh
|
$154
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $329,209 | $25,495 |
$249,584
4,209,956
kWh
|
$72,082
-
kW-mo/yr
|
$8,797 | $(-1,254.0) | ||
TOTAL IMPLEMENTED | $11,576 | $19,367 |
$11,634
204,028
kWh
|
$1,196
-
kW-mo/yr
|
- | $(-1,254.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs