ITAC Assessment: AS0479
ITAC logo
ITAC Assessment: AS0479
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Perfumes, Cosmetics, and Toilet Preparations
NAICS 325611: Soap and Other Detergent Manufacturing
SIC 2844: Perfumes, Cosmetics, and Other Toilet Preparations
Sales Range less than $500
k
# of Employees 50
Plant Area 30,100
ft2
Annual Production 1,385
ton
Production Hrs. Annual 5,928
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,721 1,149,000
kWh
Electricity Demand $95,550 4,898
kW-mo/yr
Electricity Fees $19,024 -
Natural Gas $15,839 5,661
MMBtu
TOTAL YEARLY COSTS $185,134
RECOMMENDED SAVINGS* $55,478 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $37,930

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $20,215 $200 - - $20,215
02 2.9114: Use solar heat to make electricty $15,892 $111,826 $7,208
151,427
kWh
$8,684
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,108 $6,016 $7,953
167,095
kWh
$4,155
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,979 $1,639 $1,199
25,207
kWh
$780
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,834 $330 $1,027
21,580
kWh
$807
-
kW-mo/yr
-
06 2.7232: Replace existing hvac unit with high efficiency model $1,794 $7,400 $714
15,005
kWh
$1,080
-
kW-mo/yr
-
07 2.7135: Install occupancy sensors $1,596 $4,600 $1,596
33,527
kWh
- -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $60 $281 $60
1,250
kWh
- -
TOTAL RECOMMENDED $55,478 $132,292 $19,757
415,091
kWh
$15,506
-
kW-mo/yr
$20,215
TOTAL IMPLEMENTED $37,930 $15,585 $10,893
228,887
kWh
$6,822
-
kW-mo/yr
$20,215
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs