ITAC Assessment: AS0467
ITAC logo
ITAC Assessment: AS0467
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Commercial paper rolls
NAICS 322121: Paper (except Newsprint) Mills
SIC 2621: Paper Mills
Sales Range $10
M
to 50
M
# of Employees 132
Plant Area 350,000
ft2
Annual Production 3,300,000
units
Production Hrs. Annual 6,069
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $200,314 3,230,883
kWh
Electricity Demand $148,996 10,383
kW-mo/yr
TOTAL YEARLY COSTS $349,310
RECOMMENDED SAVINGS* $76,753 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $64,356

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4133: Use most efficient type of electric motors $47,588 $48,177 $33,520
540,691
kWh
$14,068
-
kW-mo/yr
02 2.7232: Replace existing hvac unit with high efficiency model $12,397 $53,000 $6,485
104,580
kWh
$5,912
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $10,754 $16,690 $7,378
119,000
kWh
$3,376
-
kW-mo/yr
04 2.4231: Reduce the pressure of compressed air to the minimum required $6,014 $200 $4,126
66,555
kWh
$1,888
-
kW-mo/yr
TOTAL RECOMMENDED $76,753 $118,067 $51,509
830,826
kWh
$25,244
-
kW-mo/yr
TOTAL IMPLEMENTED $64,356 $65,067 $45,024
726,246
kWh
$19,332
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs