ITAC Assessment: AS0464
ITAC logo
ITAC Assessment: AS0464
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Fluid Milk
NAICS 311511: Fluid Milk Manufacturing
SIC 2026: Fluid Milk
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 42,000
ft2
Annual Production 1,600
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $114,756 2,864,160
kWh
Electricity Demand $99,332 6,434
kW-mo/yr
Electricity Fees $48,301 -
Natural Gas $84,604 10,899
MMBtu
Fuel Oil #1 $1,814,400 59,235
MMBtu
Waste Disposal Costs
Water Usage $196,977 2,642
Tgal
TOTAL YEARLY COSTS $2,358,370
RECOMMENDED SAVINGS* $154,706 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $62,487

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #1 Savings
01 2.8223: Add air shields to trucks to increase fuel mileage $59,350 $126,000 - - - $59,350
-
MMBtu
02 2.9113: Use solar heat for heat $48,323 $319,500 $20,535
512,101
kWh
$27,788
-
kW-mo/yr
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $20,226 $2,867 $13,238
332,363
kWh
$6,988
-
kW-mo/yr
- -
04 2.8226: Increase efficiency of trucks $15,760 $26,200 - - - $15,760
-
MMBtu
05 2.1243: Use heat from boiler blowdown to preheat boiler feed water $7,910 $3,232 - - $7,910
-
MMBtu
-
06 2.2135: Repair and eliminate steam leaks $3,137 $348 - - $3,137
-
MMBtu
-
TOTAL RECOMMENDED $154,706 $478,147 $33,773
844,464
kWh
$34,776
-
kW-mo/yr
$11,047
-
MMBtu
$75,110
-
MMBtu
TOTAL IMPLEMENTED $62,487 $126,348 - - $3,137
-
MMBtu
$59,350
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #1 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs