Assessment Year | 2019 |
---|---|
Principal Product | Fluid Milk |
NAICS | 311511: Fluid Milk Manufacturing |
SIC | 2026: Fluid Milk |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
40,000
ft2
|
Annual Production | 1,600
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $117,952 | 2,891,220 |
kWh
|
$0.041 | |
Electricity Demand | $107,031 | 6,915 |
kW-mo/yr
|
$15.48 | |
Electricity Fees | $50,555 | - |
|
- | |
Natural Gas | $101,244 | 13,086 |
MMBtu
|
$7.74 | |
Fuel Oil #1 | $1,626,217 | 52,724 |
MMBtu
|
$30.84 | |
Waste Disposal Costs | |||||
Water Usage | $228,404 | 3,855 |
Tgal
|
$59.24 | |
TOTAL YEARLY COSTS | $2,231,403 | ||||
RECOMMENDED SAVINGS* | $116,359 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $65,615 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #1 Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.8223: Add air shields to trucks to increase fuel mileage | $56,524 | $90,000 | - | - | - |
$56,524
-
MMBtu
|
|
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $31,405 | $2,867 |
$20,666
506,509
kWh
|
$10,739
-
kW-mo/yr
|
- | - | |
03 | 2.8226: Increase efficiency of trucks | $11,257 | $18,720 | - | - | - |
$11,257
-
MMBtu
|
|
04 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $8,082 | $3,232 | - | - |
$8,082
-
MMBtu
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,693 | - |
$4,404
107,944
kWh
|
$2,289
-
kW-mo/yr
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,398 | $6,295 |
$1,828
44,803
kWh
|
$570
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $116,359 | $121,114 |
$26,898
659,256
kWh
|
$13,598
-
kW-mo/yr
|
$8,082
-
MMBtu
|
$67,781
-
MMBtu
|
||
TOTAL IMPLEMENTED | $65,615 | $96,295 |
$6,232
152,747
kWh
|
$2,859
-
kW-mo/yr
|
- |
$56,524
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #1 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs