ITAC Assessment: AS0389
ITAC logo
ITAC Assessment: AS0389
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Ice Cream Cones
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area 150,000
ft2
Annual Production 350,000
pieces
Production Hrs. Annual 8,256
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $159,980 2,815,920
kWh
Electricity Demand $8,905 5,593
kW-mo/yr
Electricity Fees $14,383 -
Natural Gas $300,058 46,202
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,095 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,134

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $34,306 $12,480 $27,457
613,560
kWh
$6,849
-
kW-mo/yr
02 2.4133: Use most efficient type of electric motors $1,163 $1,698 $939
21,327
kWh
$224
-
kW-mo/yr
03 2.6218: Turn off equipment when not in use $310 $506 $310
6,929
kWh
-
04 2.5124: Use gravity feeds wherever possible $345 $150 $291
6,496
kWh
$54
-
kW-mo/yr
05 2.7142: Utilize higher efficiency lamps and/or ballasts $8,971 $7,343 $7,240
164,548
kWh
$1,731
-
kW-mo/yr
TOTAL RECOMMENDED $45,095 $22,177 $36,237
812,860
kWh
$8,858
-
kW-mo/yr
TOTAL IMPLEMENTED $10,134 $9,041 $8,179
185,875
kWh
$1,955
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs