ITAC Assessment: AS0338
ITAC logo
ITAC Assessment: AS0338
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Concrete
NAICS
n/a
SIC 3273: Ready-Mixed Concrete
Sales Range $5
M
to 10
M
# of Employees 45
Plant Area 283,140
ft2
Annual Production 192,000
units
Production Hrs. Annual 4,298
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $36,170 463,350
kWh
Electricity Demand $3,867 1,328
kW-mo/yr
Electricity Fees $2,187 -
Other Gas $380,000 60,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,982 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,270

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $392 $1,387 $357
4,350
kWh
$35
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $281 - $255
3,110
kWh
$26
-
kW-mo/yr
-
03 2.6218: Turn off equipment when not in use $395 $1,422 $395
4,814
kWh
- -
04 2.1224: Replace boiler $1,014 $2,300 $1,014
160
kWh
- -
05 2.7232: Replace existing hvac unit with high efficiency model $875 $2,400 $831
10,131
kWh
$44
-
kW-mo/yr
-
06 4.445: Install equipment to move product $20,025 $38,900 - - $20,025
TOTAL RECOMMENDED $22,982 $46,409 $2,852
22,565
kWh
$105
-
kW-mo/yr
$20,025
TOTAL IMPLEMENTED $1,270 $3,822 $1,226
14,945
kWh
$44
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs