Assessment Year | 2001 |
---|---|
Principal Product | Prefabricated Houses and Wood Buildings |
NAICS |
n/a
|
SIC | 2452: Prefabricated Wood Buildings and Components |
Sales Range | $5 M to 10M |
# of Employees | 35 |
Plant Area |
55,000
ft2
|
Annual Production | 694
units
|
Production Hrs. Annual | 2,268
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $4,950 | 79,680 |
kWh
|
$0.062 |
Electricity Demand | $688 | 324 |
kW-mo/yr
|
$2.12 |
Electricity Fees | $875 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $104,520 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,068 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $834 | $2,736 |
$543
9,725
kWh
|
$291
-
kW-mo/yr
|
- | - | |
02 | 2.7135: Install occupancy sensors | $91 | $450 |
$63
1,132
kWh
|
$28
-
kW-mo/yr
|
- | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $68 | $60 |
$22
386
kWh
|
$46
-
kW-mo/yr
|
- | - | |
04 | 2.7232: Replace existing hvac unit with high efficiency model | $533 | $1,400 |
$403
7,234
kWh
|
$130
-
kW-mo/yr
|
- | - | |
05 | 4.711: Initiate a total quality management program | $12,000 | $3,100 | - | - | $12,000 | - | |
06 | 4.513: Re-arrange equipment layout to reduce labor costs | $54,594 | $2,880 | - | - | $54,594 | - | |
07 | 4.514: Re-arrange equipment layout to reduce handling costs | $36,400 | $10,400 | - | - | - | $36,400 | |
TOTAL RECOMMENDED | $104,520 | $21,026 |
$1,031
18,477
kWh
|
$495
-
kW-mo/yr
|
$66,594 | $36,400 | ||
TOTAL IMPLEMENTED | $12,068 | $3,160 |
$22
386
kWh
|
$46
-
kW-mo/yr
|
$12,000 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs