ITAC Assessment: AS0303
ITAC logo
ITAC Assessment: AS0303
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Residential Glass Windows and Patio Doors
NAICS
n/a
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $10
M
to 50
M
# of Employees 330
Plant Area 225,000
ft2
Annual Production 350,000
pieces
Production Hrs. Annual 5,912
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $229,746 3,943,440
kWh
Electricity Demand $27,541 10,532
kW-mo/yr
Electricity Fees $20,302 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $337,070 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings
01 2.7145: Install skylights $2,313 $9,960 n/a $2,313
58,032
kWh
- - - - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $500 $60 n/a $302
7,567
kWh
$198
-
kW-mo/yr
- - - -
03 2.7135: Install occupancy sensors $418 $1,425 n/a $184
4,607
kWh
$234
-
kW-mo/yr
- - - -
04 2.4133: Use most efficient type of electric motors $98 $89 n/a $59
1,484
kWh
$39
-
kW-mo/yr
- - - -
05 3.4155: Meter waste water $11,634 $1,300 n/a - - $11,634
-
Tgal
- - -
06 3.6192: Use a less expensive method of waste removal $1,620 $60 n/a - - - - $1,620 -
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $2,604 $60 n/a - - - - $2,604 -
08 2.8114: Change rate schedules or other changes in utility service $240 $30 n/a - - - - $240 -
09 4.122: Develop standard procedures to improve internal yields $37,500 $456 n/a - - - - - $37,500
10 4.511: Expand operations into unused space $280,143 $6,204 n/a - - - $280,143 - -
TOTAL RECOMMENDED $337,070 $19,644 $2,858
71,690
kWh
$471
-
kW-mo/yr
$11,634
-
Tgal
$280,143 $4,464 $37,500
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs