Assessment Year | 2001 |
---|---|
Principal Product | Computer Circuit Boards |
NAICS |
n/a
|
SIC | 3679: Electronic Components, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 63 |
Plant Area |
25,000
ft2
|
Annual Production | 4,000
ton
|
Production Hrs. Annual | 2,125
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $59,120 | 715,440 |
kWh
|
$0.083 |
Electricity Demand | $4,532 | 2,702 |
kW-mo/yr
|
$1.68 |
Electricity Fees | $4,429 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $241,105 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $234,131 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,104 | $5,107 |
$856
11,384
kWh
|
$248
-
kW-mo/yr
|
- | - | |
02 | 2.7232: Replace existing hvac unit with high efficiency model | $4,459 | $10,800 |
$3,948
52,502
kWh
|
$511
-
kW-mo/yr
|
- | - | |
03 | 2.7135: Install occupancy sensors | $433 | $450 |
$386
5,136
kWh
|
$47
-
kW-mo/yr
|
- | - | |
04 | 2.4314: Use synthetic lubricant | $826 | $694 |
$280
3,717
kWh
|
$53
-
kW-mo/yr
|
$493
-
gal
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $152 | $60 |
$128
1,702
kWh
|
$24
-
kW-mo/yr
|
- | - | |
06 | 4.431: Train operators for maximum operating efficiency | $234,131 | $140,869 | - | - | - | $234,131 | |
TOTAL RECOMMENDED | $241,105 | $157,980 |
$5,598
74,441
kWh
|
$883
-
kW-mo/yr
|
$493
-
gal
|
$234,131 | ||
TOTAL IMPLEMENTED | $234,131 | $140,869 | - | - | - | $234,131 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs