ITAC Assessment: AS0295
ITAC logo
ITAC Assessment: AS0295
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Computer Circuit Boards
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 63
Plant Area 25,000
ft2
Annual Production 4,000
ton
Production Hrs. Annual 2,125
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $59,120 715,440
kWh
Electricity Demand $4,532 2,702
kW-mo/yr
Electricity Fees $4,429 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $241,105 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $234,131

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,104 $5,107 $856
11,384
kWh
$248
-
kW-mo/yr
- -
02 2.7232: Replace existing hvac unit with high efficiency model $4,459 $10,800 $3,948
52,502
kWh
$511
-
kW-mo/yr
- -
03 2.7135: Install occupancy sensors $433 $450 $386
5,136
kWh
$47
-
kW-mo/yr
- -
04 2.4314: Use synthetic lubricant $826 $694 $280
3,717
kWh
$53
-
kW-mo/yr
$493
-
gal
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $152 $60 $128
1,702
kWh
$24
-
kW-mo/yr
- -
06 4.431: Train operators for maximum operating efficiency $234,131 $140,869 - - - $234,131
TOTAL RECOMMENDED $241,105 $157,980 $5,598
74,441
kWh
$883
-
kW-mo/yr
$493
-
gal
$234,131
TOTAL IMPLEMENTED $234,131 $140,869 - - - $234,131
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs