ITAC Assessment: AS0250
ITAC logo
ITAC Assessment: AS0250
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Diffusers and Air Handlers
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 470
Plant Area 262,000
ft2
Annual Production 2,000,000
ton
Production Hrs. Annual 5,900
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $336,772 4,820,047
kWh
Electricity Demand $78,307 12,648
kW-mo/yr
Electricity Fees $36,636 -
Natural Gas $141,156 24,596
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,473 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,135

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $689 $696 $401
5,862
kWh
$58
-
kW-mo/yr
- $114 $116
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $7,274 $1,040 $7,274
104,924
kWh
- - - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $8,741 $120 $7,585
109,613
kWh
$1,156
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $15,394 $1,000 $12,687
183,177
kWh
$2,707
-
kW-mo/yr
- - -
05 3.6192: Use a less expensive method of waste removal $720 $30 - - $720
-
lb
- -
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $14,688 $12,256 - - $14,688
-
lb
- -
07 4.111: Add equipment/ operators to reduce production bottleneck $1,967 $180 - - - $1,967 -
TOTAL RECOMMENDED $49,473 $15,322 $27,947
403,576
kWh
$3,921
-
kW-mo/yr
$15,408
-
lb
$2,081 $116
TOTAL IMPLEMENTED $24,135 $1,120 $20,272
292,790
kWh
$3,863
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs