ITAC Assessment: AS0240
ITAC logo
ITAC Assessment: AS0240
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Custom Molded Products
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 185
Plant Area 90,000
ft2
Annual Production 70,000,000
pieces
Production Hrs. Annual 8,688
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $253,333 3,947,831
kWh
Electricity Demand $53,132 7,512
kW-mo/yr
Electricity Fees $29,793 -
Natural Gas $1,293 127
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $114,222 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,803

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,167 $9,143 $3,355
47,773
kWh
$812
-
kW-mo/yr
- - -
02 2.7145: Install skylights $2,417 $7,500 $2,417
34,584
kWh
- - - -
03 2.4133: Use most efficient type of electric motors $6,175 $8,691 $5,396
77,081
kWh
$779
-
kW-mo/yr
- - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,086 $3,800 $10,691
152,696
kWh
$1,395
-
kW-mo/yr
- - -
05 3.4151: Minimize water usage $4,646 $30 - - $4,646
-
Tgal
- -
06 3.6192: Use a less expensive method of waste removal $4,896 $60 - - - $4,896
-
lb
-
07 2.8114: Change rate schedules or other changes in utility service $37,961 $240 - - - - $37,961
08 4.454: Modify startup/shutdown times $41,874 $2,680 $32,399
532,239
kWh
$9,475
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $114,222 $32,144 $54,258
844,373
kWh
$12,461
-
kW-mo/yr
$4,646
-
Tgal
$4,896
-
lb
$37,961
TOTAL IMPLEMENTED $27,803 $12,581 $16,087
229,777
kWh
$2,174
-
kW-mo/yr
$4,646
-
Tgal
$4,896
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs