Assessment Year | 1998 |
---|---|
Principal Product | Aluminum Containers |
NAICS |
n/a
|
SIC | 3411: Metal Cans |
Sales Range | $50 M to 100M |
# of Employees | 80 |
Plant Area |
100,000
ft2
|
Annual Production | 1,050,000,000
pieces
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $776,118 | 19,497,949 |
kWh
|
$0.040 |
Electricity Demand | $315,367 | 30,309 |
kW-mo/yr
|
$10.41 |
Electricity Fees | $84,694 | - |
|
- |
Natural Gas | $592,966 | 117,081 |
MMBtu
|
$5.06 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $522,638 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,406 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Water Consumption Savings | Primary Product Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $528 | $750 |
$319
6,448
kWh
|
$209
-
kW-mo/yr
|
- | - | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,829 | $20,012 |
$10,755
237,691
kWh
|
$3,074
-
kW-mo/yr
|
- | - | - | - | - | |
03 | 2.2414: Use waste heat from hot flue gases to preheat | $141,064 | $100,000 | - | - |
$141,064
-
MMBtu
|
- | - | - | - | |
04 | 2.6212: Turn off equipment during breaks, reduce operating time | $2,577 | $785 |
$2,577
57,444
kWh
|
- | - | - | - | - | - | |
05 | 2.4325: Upgrade conveyors | $3,611 | $10,240 |
$2,752
61,547
kWh
|
$859
-
kW-mo/yr
|
- | - | - | - | - | |
06 | 3.4114: Replace city water with recycled water via cooling tower | $14,269 | $9,500 |
$(-768.0)
(-16,999)
kWh
|
$(-240.0)
-
kW-mo/yr
|
- | $(-300.0) |
$15,577
-
Tgal
|
- | - | |
07 | 4.521: Clear and rent existing space | $27,050 | $3,600 | - | - | - | - | - | - | $27,050 | |
08 | 4.514: Re-arrange equipment layout to reduce handling costs | $300,000 | $80,000 | - | - | - | $300,000 | - | - | - | |
09 | 4.131: Modify process to reduce material use/cost | $19,710 | $46,000 | - | - | - | - | - | $25,200 | $(-5,490.0) | |
TOTAL RECOMMENDED | $522,638 | $270,887 |
$15,635
346,131
kWh
|
$3,902
-
kW-mo/yr
|
$141,064
-
MMBtu
|
$299,700 |
$15,577
-
Tgal
|
$25,200 | $21,560 | ||
TOTAL IMPLEMENTED | $16,406 | $20,797 |
$13,332
295,135
kWh
|
$3,074
-
kW-mo/yr
|
- | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Water Consumption Savings | Primary Product Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs