ITAC Assessment: AS0206
ITAC logo
ITAC Assessment: AS0206
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Precision Machining
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area 20,000
ft2
Annual Production 212,000
pieces
Production Hrs. Annual 7,280
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $164,929 1,937,866
kWh
Electricity Demand $13,601 7,596
kW-mo/yr
Electricity Fees $12,634 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,136 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,059

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings By-product Production Savings
01 2.7232: Replace existing hvac unit with high efficiency model $10,800 $7,000 $8,746
177,902
kWh
$2,054
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,330 $220 $1,817
36,928
kWh
$513
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,393 $2,503 $1,051
21,395
kWh
$342
-
kW-mo/yr
- - -
04 2.7111: Reduce illumination to minimum necessary levels $1,124 $225 $721
14,654
kWh
$403
-
kW-mo/yr
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $377 $60 $294
5,862
kWh
$83
-
kW-mo/yr
- - -
06 3.6192: Use a less expensive method of waste removal $2,352 $30 - - $2,352 - -
07 3.6192: Use a less expensive method of waste removal $1,760 - - - - $1,760 -
08 4.811: Demolish old building to reduce tax and insurance bills $12,000 $100 - - - - $12,000
TOTAL RECOMMENDED $32,136 $10,138 $12,629
256,741
kWh
$3,395
-
kW-mo/yr
$2,352 $1,760 $12,000
TOTAL IMPLEMENTED $5,059 $310 $2,111
42,790
kWh
$596
-
kW-mo/yr
$2,352 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs