Assessment Year | 1997 |
---|---|
Principal Product | Precision Machining |
NAICS |
n/a
|
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $1 M to 5M |
# of Employees | 30 |
Plant Area |
20,000
ft2
|
Annual Production | 212,000
pieces
|
Production Hrs. Annual | 7,280
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $164,929 | 1,937,866 |
kWh
|
$0.085 |
Electricity Demand | $13,601 | 7,596 |
kW-mo/yr
|
$1.79 |
Electricity Fees | $12,634 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $32,136 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,059 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | Ancillary Material Cost Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7232: Replace existing hvac unit with high efficiency model | $10,800 | $7,000 |
$8,746
177,902
kWh
|
$2,054
-
kW-mo/yr
|
- | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,330 | $220 |
$1,817
36,928
kWh
|
$513
-
kW-mo/yr
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,393 | $2,503 |
$1,051
21,395
kWh
|
$342
-
kW-mo/yr
|
- | - | - | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $1,124 | $225 |
$721
14,654
kWh
|
$403
-
kW-mo/yr
|
- | - | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $377 | $60 |
$294
5,862
kWh
|
$83
-
kW-mo/yr
|
- | - | - | |
06 | 3.6192: Use a less expensive method of waste removal | $2,352 | $30 | - | - | $2,352 | - | - | |
07 | 3.6192: Use a less expensive method of waste removal | $1,760 | - | - | - | - | $1,760 | - | |
08 | 4.811: Demolish old building to reduce tax and insurance bills | $12,000 | $100 | - | - | - | - | $12,000 | |
TOTAL RECOMMENDED | $32,136 | $10,138 |
$12,629
256,741
kWh
|
$3,395
-
kW-mo/yr
|
$2,352 | $1,760 | $12,000 | ||
TOTAL IMPLEMENTED | $5,059 | $310 |
$2,111
42,790
kWh
|
$596
-
kW-mo/yr
|
$2,352 | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | Ancillary Material Cost Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs