ITAC Assessment: AS0133
ITAC logo
ITAC Assessment: AS0133
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product concrete
NAICS
n/a
SIC 3273: Ready-Mixed Concrete
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 100,000
ft2
Annual Production 1,000,000
ton
Production Hrs. Annual 4,160
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $266,578 4,659,144
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,079 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,620

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $10,657 $20,486 $10,657
186,401
kWh
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,311 - $3,311
57,737
kWh
03 2.4231: Reduce the pressure of compressed air to the minimum required $491 - $491
8,499
kWh
04 2.4314: Use synthetic lubricant $1,459 $2,459 $1,459
7,327
kWh
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $769 $200 $769
13,482
kWh
06 2.2612: Use cooling tower water instead of refrigeration $1,424 $3,000 $1,424
24,912
kWh
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,341 $7,356 $2,341
41,032
kWh
08 2.7142: Utilize higher efficiency lamps and/or ballasts $414 $698 $414
7,327
kWh
09 2.8114: Change rate schedules or other changes in utility service $12,213 $25,250 $12,213
-
kWh
TOTAL RECOMMENDED $33,079 $59,449 $33,079
346,717
kWh
TOTAL IMPLEMENTED $17,620 $26,145 $17,620
289,859
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs