ITAC Assessment: AS0129
ITAC logo
ITAC Assessment: AS0129
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product wood mouldings
NAICS
n/a
SIC 2431: Millwork
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 80,000
ft2
Annual Production 3,300,000
thousand feet
Production Hrs. Annual 2,600
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $115,589 1,105,510
kWh
Natural Gas $11,503 2,715
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,598 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,870

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,621 $4,905 $1,621
15,533
kWh
02 2.7135: Install occupancy sensors $107 $150 $107
1,172
kWh
03 2.4133: Use most efficient type of electric motors $6,771 $7,024 $6,771
64,771
kWh
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,468 - $1,468
14,068
kWh
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $870 $700 $870
8,206
kWh
06 2.6212: Turn off equipment during breaks, reduce operating time $3,761 $2,500 $3,761
34,877
kWh
TOTAL RECOMMENDED $14,598 $15,279 $14,598
138,627
kWh
TOTAL IMPLEMENTED $12,870 $10,224 $12,870
121,922
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs