ITAC Assessment: AS0063
ITAC logo
ITAC Assessment: AS0063
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product PLASTIC INJECTION MOLDS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 5,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $475,294 8,406,213
kWh
Natural Gas $10,705 2,177
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $81,803 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4322: Use or replace with energy efficient substitutes $19,891 $70,000 $19,891
351,700
kWh
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,159 $2,365 $1,159
20,516
kWh
-
03 2.2511: Insulate bare equipment $29,882 $8,320 $29,882
528,429
kWh
-
04 2.6212: Turn off equipment during breaks, reduce operating time $6,780 $653 $6,780
119,871
kWh
-
05 2.6212: Turn off equipment during breaks, reduce operating time $2,242 $432 $2,242
39,566
kWh
-
06 2.4133: Use most efficient type of electric motors $4,186 $21,367 $4,186
74,150
kWh
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $415 $100 $415
7,327
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $3,336 $10,325 $3,513
62,134
kWh
$(-177.0)
09 2.7142: Utilize higher efficiency lamps and/or ballasts $525 $61 $570
9,965
kWh
$(-45.0)
10 2.7142: Utilize higher efficiency lamps and/or ballasts $13,268 $7,024 $13,268
234,760
kWh
-
11 2.7142: Utilize higher efficiency lamps and/or ballasts $119 $300 $119
2,052
kWh
-
TOTAL RECOMMENDED $81,803 $120,947 $82,025
1,450,470
kWh
$(-222.0)
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings