Assessment Year | 1992 |
---|---|
Principal Product | MEXICAN FOOD PRODUCTS |
NAICS |
n/a
|
SIC | 2032: Canned Specialties |
Sales Range | $10 M to 50M |
# of Employees | 187 |
Plant Area |
n/a
|
Annual Production | 5,200,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $374,278 | 5,623,388 |
kWh
|
$0.067 |
Natural Gas | $987,226 | 192,682 |
MMBtu
|
$5.12 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $136,923 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $83,257 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $2,641 | $31,121 |
$2,641
39,566
kWh
|
- | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,207 | - |
$1,207
18,171
kWh
|
- | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,961 | $7,628 |
$1,961
29,601
kWh
|
- | - | |
04 | 2.2511: Insulate bare equipment | $12,327 | $5,772 | - |
$12,327
-
MMBtu
|
- | |
05 | 2.2136: Install / repair insulation on steam lines | $2,693 | $989 | - |
$2,693
-
MMBtu
|
- | |
06 | 2.2135: Repair and eliminate steam leaks | $61,904 | $27,000 | - |
$61,904
-
MMBtu
|
- | |
07 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $68,532 | $7,500 | - |
$68,532
-
MMBtu
|
- | |
08 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $(-39,218.0) | $800,000 |
$381,894
5,135,991
kWh
|
$(-344,072.0)
-
MMBtu
|
$(-77,040.0) | |
09 | 2.7422: Plant trees or shrubs near windows to shield from sunlight | $202 | $420 |
$202
2,931
kWh
|
- | - | |
10 | 2.7234: Use heat pump for space conditioning | $3,520 | $12,000 |
$3,520
52,755
kWh
|
- | - | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $877 | $7,308 |
$1,275
19,050
kWh
|
- | $(-398.0) | |
12 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,687 | $3,584 |
$12,687
190,504
kWh
|
- | - | |
13 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,333 | $400 |
$6,333
95,252
kWh
|
- | - | |
14 | 2.4312: Improve lubrication practices | $1,257 | $1,092 |
$1,257
18,757
kWh
|
- | - | |
TOTAL RECOMMENDED | $136,923 | $904,814 |
$412,977
5,602,578
kWh
|
$(-198,616.0)
-
MMBtu
|
$(-77,438.0) | ||
TOTAL IMPLEMENTED | $83,257 | $34,161 |
$6,333
95,252
kWh
|
$76,924
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs