ITAC Assessment: AS0038
ITAC logo
ITAC Assessment: AS0038
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product MOTOR POLYGON ASSEMBLIES
NAICS
n/a
SIC 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area
n/a
Annual Production 14,400
pieces
Production Hrs. Annual 6,024
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $97,859 1,115,182
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,065 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4322: Use or replace with energy efficient substitutes $13,870 $52,500 $13,870
158,851
kWh
02 2.7422: Plant trees or shrubs near windows to shield from sunlight $2,635 $1,000 $2,635
30,188
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,312 $4,780 $4,312
49,238
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,384 $346 $2,384
27,257
kWh
05 2.7111: Reduce illumination to minimum necessary levels $1,448 - $1,448
16,706
kWh
06 2.4231: Reduce the pressure of compressed air to the minimum required $901 $40 $901
10,258
kWh
07 2.4312: Improve lubrication practices $515 - $515
5,862
kWh
TOTAL RECOMMENDED $26,065 $58,666 $26,065
298,360
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs