Assessment Year | 1999 |
---|---|
Principal Product | Refrigeration Equipment |
NAICS |
n/a
|
SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
Sales Range | $5 M to 10M |
# of Employees | 60 |
Plant Area |
212,580
ft2
|
Annual Production | 5,000
pieces
|
Production Hrs. Annual | 2,040
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $127,894 | 1,882,474 |
kWh
|
$0.068 |
Electricity Demand | $24,179 | 7,518 |
kW-mo/yr
|
$3.22 |
Natural Gas | $33,461 | 7,306 |
MMBtu
|
$4.58 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $82,906 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $646 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7111: Reduce illumination to minimum necessary levels | $520 | $280 |
$474
6,741
kWh
|
$46
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $445 | $285 |
$348
4,982
kWh
|
$97
-
kW-mo/yr
|
- | |
03 | 2.4133: Use most efficient type of electric motors | $120 | $288 |
$94
1,465
kWh
|
$26
-
kW-mo/yr
|
- | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $82 | - |
$64
879
kWh
|
$18
-
kW-mo/yr
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $564 | $170 |
$448
6,155
kWh
|
$116
-
kW-mo/yr
|
- | |
06 | 4.423: Move product using mechanical means | $24,235 | $14,500 | - | - | $24,235 | |
07 | 4.441: Install automatic packing equipment | $56,940 | $75,000 | - | - | $56,940 | |
TOTAL RECOMMENDED | $82,906 | $90,523 |
$1,428
20,222
kWh
|
$303
-
kW-mo/yr
|
$81,175 | ||
TOTAL IMPLEMENTED | $646 | $170 |
$512
7,034
kWh
|
$134
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs